After about a year of intense fine tuning Digirig Mobile went through nine revisions and it is now ready to graduate into higher volume production. Let’s take a look at the specifics.
Digirig Mobile Rev 1.5
The test batch of Digirig Mobile is all sold out and enjoying high grades from early adopters. Now the new revision 1.5 is publicly available with ample inventory. Let’s look at the changes and improvements…
Digirig Shack Rev 1.2
With Digirig Mobile getting all the attention, let’s not forget about its larger sibling Digirig Shack. The new prototype is built and looking sweet. Let’s look a the changes.
Tester Batch Manufacturing Update
The early access batch of Digirig Mobile is on the schedule to become available to early adopters later this month. The first 144 boards are assembled and being tested.
Tester Batch Ordered
The new revision of Digirig Mobile is going into production. A hundred of early access units are expected be available to testers in March.
Mobile Revision 1.2
New revision of Digirig Mobile is redesigned to fit into a standard extruded aluminum enclosure. Better idea for rig isolation.
Mobile Version Test
Today I had a chance to test the Digirig Mobile prototype on the air. Several dozen FT8 QSOs concluded that it was a success. As a bonus to significantly decluttered cabling, I also had a more reliable CAT control.
First Prototype Build
The PCBs have arrived and I spent most of the day building and troubleshooting of the first prototype. Not is is complete and everything is working. Next is internal testing!
Components Piling Up
The PCB house reported completion and shipment of the prototype boards, meanwhile the pile of components for the prototype build is growing.
Project Plan
Multiple versions of the interface are developed at the same time to help determine which features are vital for different use cases. The field testing and user feedback will guide the iterative design changes. This might ultimately result in a